Well, it's November, and I've almost wrapped up the 'summer project' play structure. It was a sunny day yesterday so I snapped a couple pics.

An off-the-shelf structure wouldn't work because we were building on an incline and over a retaining wall, so we decided to do something custom. As usual, this led to my getting a bit carried away.

Original rough concept in Sketchup:


Same, with rough orientation in situ:


Final product (still need a few pieces of trim, a pirate flag for the mast, etc):


From the downhill side (still needs a few pieces of 'hull' planking), showing slide and climbing wall:



I'll post some more pics after getting the last bits of trim done (hopefully this year!!)